★★★★★ 4.9/5 Rated
🛡️ 10-Year Guarantee
🚚 Free UK Delivery
📍 20,000+ Mattresses Since 1985
Need help? I'm here to help you find the perfect motorhome mattress. 📞 0121 663 6114 💬 WhatsApp 07769 431 970
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:CoolpD109

Coolplus Right S Curve Motorhome Mattress - Double

Coolplus Right S Curve Motorhome Mattress - Double

Regular price £559.00
Regular price Sale price £559.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Choose How to Provide Measurements
📏 Enter Your Measurements Now
  1. Enter precise measurements in your preferred unit
  2. After entering your measurements, scroll down the page and click 'Add to cart' to continue.
Quick measuring reference

Quick measuring reference - click above for detailed guide

Vehicle Details (Optional but helpful)

📧 I'll Email My Measurements After Ordering

No problem — send your measurements after ordering. Email or WhatsApp them to 07769 431 970 with your order number and we'll take care of the rest.

📦 Prefer to Trace Your Mattress? Request a Free Template Kit

We'll post you a free measuring kit — craft paper, marker and prepaid return envelope. Simply trace your mattress shape and post it back.

Arrives within 1–2 working days · Completely free · No payment required

Quantity

Motorhome Mattress Experts Since 1982

Built to Last

Up to 10-year guarantee - quality materials last decades, not months

Handcrafted in Britain

Made in our UK workshop - not mass-produced overseas

Free UK Delivery

Complimentary delivery - upgrading should be effortless

Perfect Custom Fit

Made specifically for your motorhome - no gaps or poor fitting

View full details

Coolplus™ Mattress

ReVo™ cool gel memory foam — 30x more breathable than standard memory foam, laboratory-proven

Coolplus™ Mattress
  • 3 firmness levels: Medium-firm, Firm Orthopaedic, Hard
  • Depths from 15–25 cm
  • 5-year guarantee
  • Coolplus® zip-off washable cover
  • ReVo™ cooling layer — 30x breathability vs memory foam
  • Laytec™ responsive comfort — rebounds faster than memory foam
  • Triple-layer construction
  • Lightweight design

Triple-Layer Construction
Coolplus™ triple-layer construction diagram
  1. Coolplus® Zip-Off Cover

    Superior moisture-wicking with excellent temperature regulation. Easy to remove and machine wash.

  2. ReVo™ Cooling Performance Top Layer

    Advanced cool gel technology delivers 30x better airflow than memory foam for optimal sleep temperature.

  3. Laytec™ Responsive Comfort Middle Layer

    Responsive support with faster recovery than memory foam. Spring-like bounce back with proper spinal alignment.

  4. Premium Foundation Layer

    Enhanced ventilation with exceptional stability and durability in a lightweight construction.

Why Choose Coolplus™?

The Coolplus™ features ReVo™ cool gel memory foam that delivers 30x more breathability than standard memory foam — laboratory-proven for optimal sleep temperature. Combined with a Laytec™ responsive comfort layer that rebounds faster than traditional memory foam, it keeps you cool without sacrificing support.

Ideal for:

  • Hot sleepers needing superior temperature regulation
  • Those who prefer responsive foam that bounces back quickly
  • Couples wanting motion isolation with enhanced breathability
  • Anyone requiring orthopaedic support with cooling comfort
Firmness & Depth Options

Firmness Levels

Medium-firm

Cooling comfort with responsive support

Firm Orthopaedic

Enhanced support with ReVo™ cooling

Hard

Maximum support with enhanced breathability

Available Depths

15 cm

Compact cooling and responsive comfort for tighter spaces.

20 cm

Optimal balance of cooling comfort and adaptive support.

25 cm

Maximum cooling and responsive technology for premium comfort.

All depths available in Medium-firm, Firm Orthopaedic, and Hard.

Care & Maintenance

Mattress

  • No-flip design — one-sided use with a marked sleeping surface
  • Rotate head-to-foot periodically for even wear
  • Allow ventilation to maximise the 30x breathability
  • Naturally resistant to dust mites

Coolplus® Cover

  • Machine wash at 30 °C on a gentle cycle
  • Use mild liquid detergent — no bleach
  • Air dry only
  • Iron on low if needed
  • Wash every 1–2 months
Measuring Guide

We always recommend reducing your order size by a couple of centimetres to allow room for tucking in bedding, though this remains a personal preference.

Delivery
  • Free delivery to most addresses in England, Scotland, and Wales
  • Rolled and vacuum-packed in a 158 × 39 × 39 cm box for easy handling
  • Lead time typically 7–14 days depending on demand and production capacity

Specific mattress weights are available on request.

Frequently Asked Questions
How do Laytec™ and ReVo™ work together?
Laytec™ provides responsive bounce back whilst ReVo™ delivers cooling performance — together they give you support without the heat buildup of standard memory foam.
What does 30x breathability actually mean?
Laboratory testing shows the ReVo™ layer allows 30 times more airflow than traditional memory foam, preventing heat buildup and moisture retention.
How long does a rolled mattress take to expand?
1–2 hours for basic expansion; allow 12–24 hours for full cooling and responsive performance activation.
What's included?
The mattress with Coolplus® zip-off cover, care instructions, and a 5-year guarantee.
Is the Firm Orthopaedic option suitable for everyday use?
Absolutely — it's designed for therapeutic support whilst maintaining cooling comfort for all sleeping positions.

5-Year GuaranteeQuality assured, built with confidence