✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
You are here
Skip to product information
1 of 4

SKU:BodyK109

Bodyshape Right S Curve Motorhome Mattress - King

Regular price £439.00
Regular price Sale price £439.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@motorhomemattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Bodyshape™ Motorhome Mattress lifestyle Lifestyle

Triple Layer Construction

Memory foam that softens to your shape and cushions your hips and shoulders (Vasco™). It soaks up movement too, so when one of you gets up in the night the other stays asleep.

Bodyshape™ triple-layer construction diagram
  1. Moisture-wicking zip-off cover (TENCEL™)

    Wicks moisture away overnight so the top stays fresh. It unzips in moments and machine-washes on its own — no dragging the whole mattress out to air.

  2. Memory foam top layer that moulds to you (Vasco™)

    Warms to your body and cradles your shoulders, hips and back, relieving the sore spots a hard motorhome bed base leaves behind.

  3. Supportive base layer that keeps you from sinking in

    Works under the memory foam to hold your spine in line and stop you sinking through. It also dampens movement, so one of you shifting doesn't wake the other.

  4. Firm base layer

    A firm, durable base that keeps its shape season after season — while staying light enough to lift and handle in cramped quarters.

Why Choose Bodyshape™?

Factory motorhome beds tend to be narrow, hard and set close together, with thin foam that gives little back. After a long drive, that's when every ache shows up. The Bodyshape™ is designed to put that right: its Vasco™ memory foam layer contours to you and pads your shoulders and hips, while the support layer below holds your spine steady and absorbs movement.

In a compact cabin that motion control counts double — sleeping side by side, the Bodyshape™ soaks up a partner rolling over or slipping out in the night, so your sleep isn't broken.

Ideal for:

  • Couples bunked close together who don't want to feel every shift
  • Anyone waking stiff in the shoulders, hips or back on a hard van bed
  • Side sleepers after foam that cushions and follows their shape
  • Travellers who want a firm base with soft, moulding comfort on top

Firmness & Depth Options

Firmness Levels

Medium

A softer, contouring feel with even support

Firm

Added support for backs and joints

Hard

The firmest option for those who prefer a hard bed

Available Depths

15 cm

Slimline comfort for shallow bed boxes and tight spots

20 cm

A middle-ground depth that fits most motorhome beds

25 cm

Our deepest, most cushioned option for a home-from-home feel

Every depth comes in Medium, Firm and Hard. Heavier build? Get in touch and we'll point you to the right depth and firmness.

Care & Maintenance

Mattress

  • Single-sided, no-flip design with the sleep surface marked
  • Let it breathe regularly and fit a mattress protector
  • The foam layers need no special upkeep

Zip-off cover

  • Machine wash cool at 30°C on a gentle setting
  • Mild liquid detergent only — never bleach
  • Dry naturally — no tumble drying
  • A cool iron if it needs it
  • Freshen it up every month or two

Measuring Guide

We make the foam to the precise sizes you give us; the cover then adds a little to the final measurement.

If your bed drops into a snug recess, or you want space to tuck bedding in, it's worth trimming your figures slightly — though that's down to personal preference.

Delivery

  • Free delivery to most parts of England, Scotland and Wales
  • Rolled and vacuum-packed into a 158 × 39 × 39 cm box for easy carrying

Mattress weights are available on request.

Frequently Asked Questions

How does Vasco™ memory foam work?
Your body heat softens it so it moulds to your shape, spreading weight evenly and taking pressure off your shoulders, hips and back.
How good is the motion isolation?
Very good — Vasco™ foam soaks movement up instead of sending it across the bed, so a partner turning or rising won't wake you.
How long does a rolled mattress take to expand?
It usually regains 95% of its shape and size within an hour or two of unrolling; occasionally it can take around 24 hours to regain its shape fully.
What's included?
The mattress, its zip-off TENCEL™ cover, care instructions and a 5-year guarantee.
Is the Firm option suitable for everyday use?
Yes. Choosing Firm adds support underneath, and the memory foam on top still cushions you, so it's comfortable night after night in any sleeping position.
5-Year Guarantee Made in Britain, quality-assured with confidence

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.