✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
You are here
Skip to product information
1 of 4

SKU:ComfiD105

Comfisan Left S Curve Motorhome Mattress - Double

Regular price £389.00
Regular price Sale price £389.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@motorhomemattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Comfisan™ Motorhome Mattress lifestyle Lifestyle

Multi-Layer Construction

Firm support that springs back instead of letting you sink. It holds your back in line after a long day at the wheel, and you'll never have to turn it.

Comfisan™ multi-layer construction diagram
  1. Moisture-wicking cover, stitched in (TENCEL™)

    A naturally hypoallergenic, moisture-wicking cover sewn permanently in place for a smooth, seamless finish and longer life — no zip to fail or work loose.

  2. Springy top layer that pushes back (Vita Reflex™)

    Cushions your body and supports your spine, then lifts straight back as you move — none of that slow, sinking sensation. It recovers quicker than memory foam, so turning over feels easy rather than stuck.

  3. Firm base layer

    A firm, steady base built to keep its shape and deliver even support right across the mattress, year after year.

Why Choose Comfisan™?

Hours behind the wheel, hauling gear in and out, and cramped fixed beds all add up for your back — and a worn, sagging motorhome mattress makes it worse. The Comfisan™ is built around support. Its Vita Reflex™ layer eases pressure points while keeping your spine aligned, lifting back as you move instead of letting you sink. The firm, steady base underneath keeps that support even from one edge to the other.

It's also the easiest of the range to live with day to day — light to handle, single-sided, and just as happy on a fixed bed as on an adjustable base.

Ideal for:

  • Anyone with back or joint concerns who needs firmer, supportive sleep
  • People who find memory foam too soft or too slow to bounce back
  • Those after responsive comfort that won't sink
  • Adjustable-bed owners — the build flexes with the base

Firmness & Depth Options

Firmness Levels

Medium-firm

Supportive with a touch of gentle give

Hard

The firmest option for those who like a very firm bed

Available Depths

15 cm

Slimline support for shallow bed boxes and tight spots

20 cm

A middle-ground depth that fits most motorhome beds

25 cm

The deepest, most supportive option for a home-from-home feel

Every depth comes in Medium-firm and Hard. Heavier build? Get in touch and we'll point you to the right depth and firmness.

Care & Maintenance

Mattress

  • Single-sided, no-flip design with the sleep surface marked
  • Let it breathe regularly and fit a mattress protector
  • Hypoallergenic build naturally resists dust mites

Fixed cover

  • Sponge it clean with mild detergent and water
  • Let it dry out fully before use
  • Add a mattress protector for extra care
  • Have it professionally cleaned if needed

Measuring Guide

We make the foam to the precise sizes you give us; the cover then adds a little to the final measurement.

If your bed drops into a snug recess, or you want space to tuck bedding in, it's worth trimming your figures slightly — though that's down to personal preference.

Delivery

  • Free delivery to most parts of England, Scotland and Wales
  • Rolled and vacuum-packed into a 158 × 39 × 39 cm box for easy carrying

Mattress weights are available on request.

Frequently Asked Questions

Why does the Comfisan™ have a fixed cover?
A sewn-in cover gives a neater, seamless finish and lasts longer, with no zip to wear out. Spot clean it and use a mattress protector to keep it fresh.
How long does a rolled mattress take to expand?
It usually regains 95% of its shape and size within an hour or two of unrolling; occasionally it can take around 24 hours to regain its shape fully.
What's included?
The mattress with its fixed TENCEL™ cover, care instructions and a 5-year guarantee.
Is it suitable for adjustable beds?
Yes. Raise or lower the base and the mattress moves with it, and the firm support underneath doesn't give way as it bends.
5-Year Guarantee Made in Britain, quality-assured with confidence

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.