✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
You are here
Skip to product information
1 of 4

SKU:CoolpSK105

Coolplus Left S Curve Motorhome Mattress - Super King

Regular price ยฃ649.00
Regular price Sale price ยฃ649.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit โ†’

Quick measuring reference

Place your order and send your measurements afterwards โ€” email us at hello@motorhomemattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit โ€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back โ€” we'll do the rest.

Sent once your mattress order is placed ยท Completely free ยท Posted out promptly

Vehicle Details

Optional but helpful โ€” the more detail you provide, the better we can match your mattress

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Coolplus Motorhome Mattress lifestyle Lifestyle

Triple Layer Construction

Stay cool in the smallest cabin โ€” a foam that lets heat escape rather than store it, laboratory-proven 30ร— more breathable than ordinary memory foam (Revoโ„ข).

Coolplus triple-layer construction diagram
  1. Moisture-wicking zip-off cover (Coolplusโ„ข)

    Pulls warmth and moisture away from you through the night. It unzips in moments and machine-washes on its own โ€” no dragging the whole mattress out to air.

  2. Top layer that draws the heat away (Revoโ„ข)

    The internet calls this a cool gel foam. There is no gel in it โ€” the foam is made with open cells, so it releases your body heat instead of trapping it. Laboratory-proven 30ร— more breathable than ordinary memory foam, so heat won't build up beneath you in a warm cabin.

  3. Responsive middle layer that keeps you lifted

    Lifts back quickly as you move, so you never feel sunk into the bed. Keeps your spine evenly supported in any sleeping position.

  4. Firm base layer

    A firm, durable base that keeps its shape season after season โ€” while staying light enough to lift and handle in cramped quarters.

A hand was held on each foam, then lifted off. These are heat pictures of what it left behind — red is warm, blue is cool.

Heat picture of our Revo foam the moment a hand is lifted off it: a bright warm hand shape
Our Revo™ foam, hand just lifted
The same Revo foam one minute later: the warm hand shape has faded away
Our Revo™ foam, one minute later
Heat picture of a leading memory foam the moment a hand is lifted off it: a bright warm hand shape
A leading memory foam, hand just lifted
The same memory foam one minute later: still glowing red, still holding the heat
A leading memory foam, one minute later

A minute on, the memory foam is still holding the heat. Ours has let it go. That is what we mean when we say it sleeps cooler. Heat pictures by The Vita Group, who make the foam for us.

Why Choose Coolplus?

Motorhome and boat cabins hold heat in. On a warm night an ordinary foam mattress keeps hold of it โ€” and you can't just fling the windows open on a busy site or at a mooring. That is what the Coolplus is built for. Its top layer moves thirty times more air than memory foam, carrying heat away rather than storing it, while the responsive layer below lifts back quickly to keep you supported and aligned. The upshot is cool, settled sleep with none of that sunk-in, stuck feeling.

Ideal for:

  • Anyone sleeping in a motorhome or boat where the cabin turns hot and stuffy
  • Hot sleepers who overheat on ordinary foam
  • People who don't like the slow, sinking feel of memory foam
  • Touring couples who want a firm bed that still sleeps cool

Firmness & Depth Options

Firmness Levels

Medium

An even feel with responsive support

Firm

Added support for backs and joints

Hard

The firmest option for those who prefer a firm bed

Available Depths

15 cm

Slimline comfort for shallow bed boxes and tight spots

20 cm

A middle-ground depth that fits most motorhome beds

25 cm

The deepest, most supportive option for a home-from-home feel

Every depth comes in Medium, Firm and Hard.

Care & Maintenance

Mattress

  • Single-sided, no-flip design with the sleep surface marked
  • Let it breathe regularly to keep it fresh
  • The foam resists dust mites

Zip-off cover

  • Machine wash cool at 30ยฐC on a gentle setting
  • Mild liquid detergent only โ€” never bleach
  • Dry naturally โ€” no tumble drying
  • A cool iron if it needs it
  • Freshen it up every month or two

Measuring Guide

We make the foam to the precise sizes you give us; the cover then adds a little to the final measurement.

If your bed drops into a snug recess, or you want space to tuck bedding in, it's worth trimming your figures slightly โ€” though that's down to personal preference.

Delivery

  • Free delivery to most parts of England, Scotland and Wales
  • Rolled and vacuum-packed into a 158 ร— 39 ร— 39 cm box for easy carrying

Mattress weights are available on request.

Frequently Asked Questions

How do the cooling and responsive layers work together?
The responsive layer gives you spring-back support while the breathable layer handles the cooling โ€” so you get proper support without the heat build-up of standard memory foam.
What does 30ร— breathability actually mean?
Lab testing shows the breathable layer moves 30 times more air than traditional memory foam, which stops heat and moisture being trapped underneath you.
How long does a rolled mattress take to expand?
It usually regains 95% of its shape and size within an hour or two of unrolling; occasionally it can take around 24 hours to regain its shape fully.
What's included?
The mattress, its Coolplus zip-off cover, care instructions and a 7-year guarantee.
Is the Firm option suitable for everyday use?
Yes. Firm adds support underneath, while the top layer keeps cushioning you and carrying the heat away — comfortable night after night, whatever position you sleep in.
7-Year Guarantee Made in Britain, quality-assured with confidence

Would you rather talk it through with someone? Ring 0121 663 6114 โ€” Monโ€“Fri 10โ€“5, Sat 10โ€“2.