✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
You are here
Skip to product information
1 of 4

SKU:Imperial2000D109

Imperial Elite 2000 Right S Curve Motorhome Mattress - Double

Regular price £829.00
Regular price Sale price £829.00
Sale Sold out
Choose Mattress Firmness
Selected surface finish
Medium feel The Medium mattress has a smooth, flat sleeping surface — the cover has no buttons.
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@motorhomemattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Imperial Elite™ 2000 Motorhome Mattress lifestyle Lifestyle

Seven Layer Construction

The finest bed in our motorhome range — 2000 pocketed springs carrying memory foam, a breathable top layer and a cashmere-blend cover, shaped to fit a fixed rear bed, island bed or French bed.

Imperial Elite™ 2000 seven-layer construction diagram
  1. Soft cashmere-blend cover

    A soft, naturally hypoallergenic knit that stays gentle against the skin and keeps its neat, tailored look through year after year of touring.

  2. Breathable comfort layer that carries the heat away (Revo™)

    A foam with open cells that draws heat away from you — laboratory-proven 30× more breathable than ordinary memory foam — so the surface stays fresh even on close summer nights with the habitation blinds pulled down.

  3. Memory foam that moulds to you (Vasco™60)

    It moulds to your shape so your hips and shoulders aren't taking all your weight, and absorbs movement so you won't be woken when your partner turns over.

  4. Layer that blends the foam into the springs

    Eases the softer comfort foams down into the spring core below, so the response moves smoothly from cushioned to supportive without a sudden change underfoot. Fitted in the Firm and Hard variants.

  5. Tufted construction

    Hand-stitched tufts lock each layer down onto the spring core and set the tension, stopping the fillings drifting across seasons of driving and setting up camp. The Medium is half-tufted, keeping its surface smooth; the Firm and Hard are fully tufted, so the buttons pull right through for the traditional dimpled surface.

  6. Two thousand pocket springs

    Two thousand springs, each housed in its own cloth pocket, flexing on their own to meet your weight and your partner's along separate lines — a buoyant, well-ventilated support with a feel all of its own.

  7. Foam surround that holds the spring unit in place

    The surround holds every spring in position — and it is what lets us build a sprung mattress to the shape of your bed. A fixed rear bed, an island bed, a French bed with its tapered corner: the springs follow the outline. Most makers cannot do it at all.

A hand was held on each foam, then lifted off. These are heat pictures of what it left behind — red is warm, blue is cool.

Heat picture of our Revo foam the moment a hand is lifted off it: a bright warm hand shape
Our Revo™ foam, hand just lifted
The same Revo foam one minute later: the warm hand shape has faded away
Our Revo™ foam, one minute later
Heat picture of a leading memory foam the moment a hand is lifted off it: a bright warm hand shape
A leading memory foam, hand just lifted
The same memory foam one minute later: still glowing red, still holding the heat
A leading memory foam, one minute later

A minute on, the memory foam is still holding the heat. Ours has let it go. That is what we mean when we say it sleeps cooler. Heat pictures by The Vita Group, who make the foam for us.

Your Surface: Smooth or Dimpled?

Every Imperial Elite™ 2000 is tufted — the buttoning that sets the spring tension and locks the fillings in place. How we tuft depends on the firmness you choose, and it changes how the top of the mattress looks and feels:

Smooth half-tufted pocket spring mattress surface - the Medium Imperial Elite 2000
Medium — Half-Tufted (Smooth) A flat, smooth top to lie on. Half-tufting sets a medium tension without any dimples.
Full-tufted dimpled pocket spring mattress surface - the Firm and Hard Imperial Elite 2000
Firm and Hard — fully tufted, dimpled finish The classic buttoned, dimpled look. Full tufting pulls the buttons through the whole mattress, which firms up the feel.

Why Choose Imperial Elite™ 2000?

The bed that leaves the factory in most coachbuilt and A-class motorhomes is a plain foam block, and you feel it after a couple of nights on the road. The Imperial Elite™ 2000 belongs in another category entirely: 2000 pocket springs form its core — the same build you would find in a good bedroom divan — giving that lifted, ventilated, unmistakably genuine mattress feel. Over the springs sit contouring memory foam and a heat-managing breathable layer, all wrapped in a soft cashmere-blend cover.

Each spring works alone, so support follows the precise outline of whoever lies down, and a shift on one side is barely felt on the other — the answer for two people sharing a slim motorhome berth. The foam surround keeps the spring unit true for years, whether the mattress sits on a fixed rear bed, an island bed, twin singles or an electric drop-down over the lounge. Short of loading your home divan into the garage, nothing comes closer to your own bed.

Ideal for:

  • Owners who want the fixed rear bed to sleep like the divan back at the house
  • Couples on an island or French bed who would rather not feel every movement pass across
  • Sleepers who favour the open, responsive lift of springs over the flat weight of all-foam
  • Anyone who wants a ten-year guarantee on their bed

Firmness Options

Medium

Gentle, yielding comfort under a cushioned cashmere surface

Firm

Firmer underneath, with the soft top layer still there

Hard

The firmest, most grounded feel we make

At 25 cm deep, you can choose any of the firmness levels.

Care & Maintenance

Mattress

  • Single-sided, no-flip design with the sleeping face marked
  • The pocket spring unit asks for no special upkeep
  • The foam surround keeps the spring unit true as the years pass

Cashmere-Blend Cover

  • Lift small marks with a spot clean and mild detergent
  • Keeps its smooth finish as time goes on
  • Hypoallergenic by nature

Measuring Guide

Send through your precise measurements and we make the foam to those figures; do remember the cover then adds a couple of millimetres to the finished size.

Plenty of motorhome beds drop into a close moulded recess, frequently boxed around a wardrobe corner or washroom wall — if that's yours, or you like a little give for tucking sheets under, take a fraction off your numbers. It's simply a matter of how you like it finished.

Delivery

  • Free delivery to most parts of England, Scotland and Wales
  • Rolled & Boxed: vacuum-sealed in a 158 × 60 × 60 cm carton

Frequently Asked Questions

What makes this the top of the range?
It is the sole spring-and-foam hybrid we make — 2000 pocketed springs paired with memory foam, a breathable top layer and a cashmere-blend cover in a multi-layer build. Nothing else in the range sleeps at this level.
How do 2000 pocket springs improve comfort?
Because each spring answers on its own, the mattress gives every part of you just the support it calls for, and a partner's movement stays where it happens instead of carrying over — a genuine plus on a shared berth.
What is the cashmere-blend cover like?
Smooth and naturally soft, hypoallergenic in itself. On the Medium it's half-tufted for a smooth finish; on the Firm and Hard it's fully tufted, with the traditional dimpled surface — either way it holds its shape and quality year on year.
How long does a rolled mattress take to expand?
It usually regains 95% of its shape and size within an hour or two of unrolling; occasionally it can take around 24 hours to regain its shape fully.
What's included?
You get the mattress with the cashmere-blend cover already on it, plus care instructions and a 10-year guarantee.
Is this your most supportive mattress?
Yes — the 2000 pocket spring system is the strongest, most supportive build we offer. Let us know your particular needs and we'll steer you to the right specification.
10-Year Guarantee Made in Britain, quality-assured with confidence

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.