✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
You are here
Skip to product information
1 of 4

SKU:NovoD109

Novolatex Right S Curve Motorhome Mattress - Double

Regular price £489.00
Regular price Sale price £489.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@motorhomemattresses.co.uk or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Vehicle Details

Optional but helpful — the more detail you provide, the better we can match your mattress

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Novolatex™ Motorhome Mattress lifestyle Lifestyle

Triple Layer Construction

Springy support that lifts you back with every turn. On a fixed rear bed or a French bed you lie on top of the mattress rather than settling into a hollow, and you'll never have to turn it.

Novolatex™ triple-layer construction diagram
  1. Deep, soft quilted zip-off cover (Cloud™)

    Sculptured, hypoallergenic and gentle on the skin, with a cushioned, cloud-like top. When it needs freshening, the whole cover zips away and goes in the wash — no wrestling the mattress out of a tight bed frame first.

  2. Springy top layer that pushes back (Laytec™)

    Eases the load on hips and shoulders, then rebounds the instant you shift. In place of the slow, sinking give of memory foam you get a lively lift, so rolling over on a narrow twin single or a snug French bed takes barely any effort.

  3. Supportive base layer that keeps you from sinking in

    Positioned just below the Laytec™ layer, this tier holds your back in line and stops you dropping too deep. Paired with the springy top, it strikes the balance between rebound and steady support night after night.

  4. Firm base layer

    A robust base tier that resists sagging and holds the mattress true through years of touring. It also keeps the overall weight down, so lifting the mattress to reach a garage or storage locker beneath a fixed bed stays a one-person job.

Why Choose Novolatex™?

Some people never get on with the way memory foam swallows you up and holds you there. If that's you, the Novolatex™ is the answer. Its Laytec™ comfort layer behaves far more like natural latex — it takes the pressure off your shoulders and hips, then springs back the moment you move, so you rest on the surface rather than in a dip. Restless sleepers who shift about, and anyone who simply likes a bed with a bit of life to it, tend to love it.

The foam's open, responsive structure lets air pass through it far more freely than dense memory foam, so it doesn't cling to warmth on a stuffy summer night parked up on site. Underneath, the adaptive support tier holds your spine level from edge to edge — welcome on the wider island beds where you spread right out.

Ideal for:

  • Anyone who finds memory foam too slow to recover and too keen to hold on
  • Fidgety sleepers who turn over repeatedly during the night
  • Those who prefer a bed with genuine bounce and buoyancy
  • Owners who want a firmer bed that still has plenty of bounce

Firmness & Depth Options

Firmness Levels

Medium

Gentle contouring with a soft, forgiving surface

Firm

Firmer underneath, with the bounce kept on top

Hard

The firmest choice, with plenty of rebound

Available Depths

15 cm

A slim, responsive build for over-cab and drop-down beds

20 cm

The everyday depth that suits most motorhome bed bases

25 cm

Our deepest build, delivering the full three-layer feel

You can order any depth in Medium, Firm or Hard. Carrying a bit more weight? Drop us a line and we'll steer you towards the depth and firmness that suits you best.

Care & Maintenance

Mattress

  • One-sided, no-flip construction — the sleeping face is clearly marked
  • The Laytec™ foam holds its rebound with next to no upkeep
  • Naturally inhospitable to dust mites

Zip-off cover

  • Machine wash cool at 30°C on a gentle setting
  • Mild liquid detergent only — never bleach
  • Dry naturally — no tumble drying
  • A cool iron if it needs it
  • Freshen it up every month or two

Measuring Guide

Give us the finished sizes you need and we'll make the foam to match — just remember the cover itself adds a few millimetres once it's fitted.

Motorhome beds often tuck into a shaped recess or wrap around a wheel arch or wardrobe, so if the fit is tight, or you like room to tuck sheets in, shave a little off your figures. It all comes down to what you prefer.

Delivery

  • Free delivery to most parts of England, Scotland and Wales
  • Rolled and vacuum-packed into a 158 × 39 × 39 cm box for easy carrying

Mattress weights are available on request.

Frequently Asked Questions

How does Laytec™ work?
Laytec™ is a fast-recovering comfort foam. It absorbs pressure like any good top layer, but rather than holding the impression it lifts back quickly, giving that characteristic latex-style spring.
What's the benefit of that springy feel?
Turning over and changing position take less effort, and the mattress feels alert rather than heavy going. Its more open structure also tends to breathe better and hold less heat than dense memory foam.
How long does a rolled mattress take to expand?
It usually regains 95% of its shape and size within an hour or two of unrolling; occasionally it can take around 24 hours to regain its shape fully.
What's included?
Your mattress, the zip-off Cloud™ cover, a set of care instructions and a 6-year guarantee.
Is Firm suitable for everyday use?
Yes. Firm adds support underneath, and the top layer still cushions and bounces back, so it suits everyday use on the road in any sleeping position.
6-Year Guarantee Made in Britain, quality-assured with confidence

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.